PPL Home>RVs for Sale>Travel Trailers>23' 2018 Cruiser RV Shadow Cruiser 195WBS w/Slide
8 mistakes booklet banner
Privacy Seals

T158SF - 23' 2018 Cruiser RV Shadow Cruiser 195WBS w/Slide

23' 2018 Cruiser RV Shadow Cruiser 195WBS w/Slide Floorplan
Click to Zoom

(Floor plan is NOT drawn to scale. Length of vehicle is approximate. Buyer is responsible for verifying actual length. PPL Motor Homes compiled this list of features, specifications, equipment and options as a guide. No representation or warranties, either express or implied, are made as to the accuracy of the information herein. Please verify for yourself all items listed before purchase.)

This vehicle has been SOLD!

Location: Summerfield, FL
Appearance Rating: Very Good
Weight: 6,160lbs

PRODUCT DESCRIPTION

23' 2018 Cruiser RV Shadow Cruiser 195WBS w/Slide

Item T158SF

This 2018 Shadow Cruiser 195WBS has an Electric Tongue Jack, 1 Slide-out, 1 Ducted Air Conditioner, Double Door Gas/12v Dometic Refrigerator, Automatic Main Awning, Outside Speakers, TV, DVD Player, Outside Shower, Microwave, 3 Burner Range, Oven

SPECIFICATIONS